Alternative flash content

    You need to upgrade your Flash Player

    Get Adobe Flash player

     DESCRIPTION OF THE SERVICES FOR GOLF COURSE PROJECT

    • GOLF COURSE DESIGN
    Make Routing plan Actual Design for:
    - Fairways
    - Green
    - Tee
    - Bunker Study
    Detail drawings :
    - Nursery
    - Contour plan
    - Grassing plan
    - Landscaping
    • CONSTRUCTION  MANAGEMENT 
      The services includes the supervising and most imported coordinating of the several sub-contractors which should be done by experienced engineers. It is also possible to manage the construction based on a total contracting lump sum.
    • CONSULTING FOR LAND PURCHASE
    The land for the project should be on the right location considering the infra structure,ideal climate,rainfall,flood-free,water supply,drainage facilities,owner supply and most important is to know the composition and condition of the soil in connection with the shaping grassing and irrigation.
    • LAND - SURVEY
    Only a good land survey with the correct leveling figures will provide a project course routing-plan with a minimum volume of excavation and filling.
    • MASTER-PLAN
    Projecting a total master-plan and to establish the proper protecting of the golf course.
    • BUDGET AND FINANCING SCHEDULE
    Based on the exact - requirement list of the project a budget and financing schedule is needed for the planning.
    • SPECIFICATION    
    Tender Document The design should be in harmony with the surroundings and a friendly environmental.
    - DRAINAGE - PLAN
    The golf course must be drained as fast as possible and kept above flood level in order not to damage the grass and landscaping.
    - IRRIGATION - SYSTEM
    The growth of grass and landscaping require a constant amount of watering and therefore the proper equipment and accesories will be specified.
    - WATER-SUPPLY
    After the research of the dry and wet season and considering other negative factors a correct water-supply system will be projected and a pump-house will be designed for the irrigation net work.
    - CIVIL-WORK
    All the road, bridges and retaining walls be designed according to the correct requirements.
    - POWER-SUPPLY
    A Golf course often requires its own power supply.
    - MAINTENANCE
    The maintenance started from the first day of grassing and has to continue all the time, as soon as 18 holes grassing is done a proper maintenance schedule will be introduced. Maintenance can also be included in this service.